Brazeau River Gas Plant
Project information
As at 31 December 2025
Description
As at 31 December 2025
Gas plant ~170 km southwest of Edmonton with 218 MMcf/d licensed capacity, able to process both sweet and sour gas; processes include inlet compression, sour gas sweetening, dehydration, NGL recovery and acid gas injection. 2025 average daily throughput 125 MMcf/d.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.