Paris Silver Project
Project information
As at 5 July 2023
Description
As at 5 July 2023
High-grade primary silver deposit hosted within the southern Gawler Range Volcanics, amenable to open-pit mining. Located approximately 70 km north of Kimba on the Eyre Peninsula, accessed via highways and sealed roads. Property sits within the 100%-owned Peterlumbo tenement. Definitive Feasibility Study is underway, incorporating a shift to wet tailings supported by the Hector Palaeochannel water source. Flagship silver asset.
Mining metrics
As at 5 July 2023 · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 5 July 2023
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.