Côté Gold
Project information
As at 31 December 2025
Description
As at 31 December 2025
Open-pit gold mine located 125 km southwest of Timmins and 175 km north of Sudbury, Ontario. The operation achieved nameplate plant throughput of 36,000 tpd in June 2025. An additional secondary cone crusher was commissioned in December 2025 to increase overall crushing capacity and optimize particle size. A strategic pit pushback is planned for 2026 to provide operational flexibility and optionality for a contemplated expansion. An updated technical report considering a larger scale mine plan targeting both the Côté and Gosselin zones is expected by the end of 2026.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.