Mentor Storage Terminal
Project information
As at 31 December 2025
Description
As at 31 December 2025
Propane storage and rail/truck loading-and-unloading facility in Mentor, Minnesota with aggregate working storage capacity of approximately 330 MBbls (a 325 MBbls underground cavern plus three above-ground bullet tanks of ~5 MBbls). Includes a dehydration facility, 11 rail unloading racks and two truck loading racks; the cavern and truck racks each have ~6 MBbl/d propane injection/withdrawal capacity.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.