Crude Oil Gathering
Project information
As at 31 December 2025
Description
As at 31 December 2025
Crude oil gathering system of approximately 615 miles of pipelines connecting Chevron- and third-party-operated wells to the Ramberg Terminal Facility, the Tioga Rail Terminal and Johnson's Corner Header System, with current capacity up to approximately 290 MBbl/d. Includes the Hawkeye Oil pumping and truck-unloading facility (75 MBbl/d receipt, ~10 MBbls storage). 2025 crude gathering throughput averaged 121 MBbl/d and crude terminaling 129 MBbl/d.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.