Kerimenge — gold project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 30 June 2025
Description
As at 30 June 2025
Structurally controlled vein-stockwork gold deposit located approximately 8km south-south-east of Wau. Currently going through prefeasibility as part of the Hidden Valley operation life-of-mine extension. Study contemplating an open-pit mining operation with ore treatment via either heap leach methods or through the HV plant.
Mining metrics
As at 30 June 2025 · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 30 June 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.