Southdown Magnetite Project
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Advanced open-cut magnetite development project located 90 km from Albany in Western Australia's Great Southern region, owned 100% by Grange Resources. Resource extends over 11 km of strike, with depths ranging from 50 m below surface in the west to 555 m in the east. The project is proposed as a pit-to-port operation comprising an open-cut mine and concentrator at the mine site near Wellstead, a 110 km underground slurry pipeline to the Port of Albany, dewatering and storage at the Port, and either transhipping from Berth 5 to Cape-size vessels in King George Sound (FS2024 base case) or direct loading from Berth 7 (FS2012 option). April 2025 Feasibility Study (FS2024) reduced the nominal concentrate production rate to 5 Mtpa with an initial mine life of 28 years; potential to expand to 10 Mtpa with further future capital investment. Installed load 79.3 MW; targeted concentrate at around 70% Fe. Tenements (held 100% by Grange Resources Ltd): M70/1309, G70/217, R70/61, L70/185, L70/186, L70/188, L70/201, L70/225. Search for joint venture / equity partners underway; bridging study to follow partner selection.
Mining metrics
As at 31 December 2025 ยท inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.