Gurupi — gold project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 3 February 2025
Description
As at 3 February 2025
Advanced exploration gold project comprising the Blanket, Contact, and Chega Tudo deposits. Located approximately 500 km west-northwest of São Luis, Maranhão, accessed via a paved highway to Maracaçumé and municipal dirt roads. Property comprises 45 contiguous permits covering approximately 1,900 km2 along the Tentugal shear zone. Mesothermal vein-type gold deposits hosted in tonalite, arkosic arenite, and dacitic metavolcanics. Acquired in December 2024 from BHP Group Limited for a 1.0% to 1.5% NSR royalty. 2025 exploration program includes 18,500 m of diamond and RC drilling targeting resource expansion ahead of a planned PEA in H2 2026.
Mining metrics
As at 3 February 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 3 February 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.