Kamoto Copper Company (KCC)
Project information
As at 31 December 2025
Description
As at 31 December 2025
Large Cu-Co operation in the Katanga (Central African) Copperbelt, DRC. Includes Kamoto Concentrator (KTC), Luilu metallurgical plant and the KOV open pit and underground mines. H1 2025 constrained by mine sequencing forcing reliance on lower-grade stockpiles; H2 2025 primary-ore access at higher grades drove +99% half-on-half uplift (125.5 kt H2 vs 63.2 kt H1). 2025 Cu metal production 247.8 kt (combined with Mutanda), Co 33.5 kt.
Mining metrics
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.