Kamoto Copper Company (KCC) — cobalt mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Large Cu-Co operation in the Katanga (Central African) Copperbelt, DRC. Includes Kamoto Concentrator (KTC), Luilu metallurgical plant and the KOV open pit and underground mines. H1 2025 constrained by mine sequencing forcing reliance on lower-grade stockpiles; H2 2025 primary-ore access at higher grades drove +99% half-on-half uplift (125.5 kt H2 vs 63.2 kt H1). 2025 Cu metal production 247.8 kt (combined with Mutanda), Co 33.5 kt.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.