Cameron Highway Oil Pipeline System (CHOPS)
Project information
As at 31 December 2025
Description
As at 31 December 2025
One of the largest crude oil pipelines in the Gulf of America (by length and design capacity), 64% owned. The 2025 CHOPS expansion overhauled the Garden Banks 72 platform topside facilities, reconnected the pipeline to GB-72 and added pumps at the High Island A5 and GB-72 platforms to increase throughput, supporting Shenandoah volumes routed via the SYNC Pipeline.