Johnson Camp Mine
Project information
As at 31 December 2025
Description
As at 31 December 2025
Operating open-pit copper skarn mine utilizing both conventional heap leaching and proprietary Nuton bioleaching technologies. First copper cathode from run-of-mine oxide production achieved in August 2025, with first Nuton copper produced in December 2025. Existing SX-EW plant has an installed capacity of 25 million pounds of copper cathode per year. Operations are currently ramping up to nameplate capacity.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.