Cerro Verde — copper & molybdenum mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Open-pit copper and molybdenum complex 20 miles southwest of Arequipa, Peru; in operation since the 1970s (previously operated by the Peru government; acquired by a Phelps Dodge predecessor in 1994). FCX owns 55.08%; SMM Cerro Verde Netherlands 21.0%, Buenaventura 19.58%, public 4.34%. Porphyry copper deposit with oxide, secondary and primary sulfide mineralization. Two concentrators with annual average permitted milling capacity of 409,500 t/d (up to 450,450 t/d), 100,000 t/d ROM leach and SX/EW (~200 Mlb/yr cathode). Fleet moves ~1,000,000 t/d. Power transitioning to fully renewable sources in 2026; processing water from Rio Chili reservoirs and Arequipa wastewater treatment. One of FCX's three S-K 1300 material properties (TRS Exhibit 96.2). Net PP&E $5.8B.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.