Nicaragua Operations (Limon + Libertad) — gold mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Hub-and-spoke gold operation with Limon and Libertad mills (combined 2.7 Mtpa installed processing capacity). Acquired June 17, 2025 via Calibre Transaction. Multiple open-pit and underground deposits. Limon: 3 contiguous mineral concessions ~100km NW of Managua. Libertad: 40-year concession (1994). 2025 production exceeded guidance: 262,025 oz (vs 200-250 koz guidance); 133,003 oz produced during Equinox ownership (Jun 17-Dec 31). Cash cost $1,272/oz; AISC $1,551/oz. Royalties: Limon 3% NSR to Royal Gold; Libertad 2% royalty + 3% ad valorem export tax.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.