Greenstone Mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Open-pit gold mine with 9.86 Mtpa carbon-in-pulp process plant. Located in Ontario, Canada. Equinox acquired initial 60% in April 2021; consolidated 100% ownership in May 2024 (acquired Orion's 40%). Commissioning Q1 2024; commercial production November 2024; in late stages of ramp-up to full design capacity. 2025 production 223,843 oz Au; cash cost $1,380/oz; AISC $1,824/oz. 2025 capex $94.5M sustaining + $121.4M non-sustaining. NI 43-101 Technical Report effective Dec 31, 2025.
Mining metrics
As at 31 December 2025 | exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.