Propylene Pipeline Network
Project information
As at 31 December 2025
Description
As at 31 December 2025
~1,620 miles of propylene pipelines: Texas RGP Gathering System (700 mi), Lou-Tex Propylene (270 mi), North Dean (250 mi), Propylene Splitter PGP Distribution System (150 mi), Taurus (120 mi, 70% via Steor LLC), Louisiana RGP Gathering (60 mi), Lake Charles PGP (30 mi, 50% undivided), Sabine (20 mi) and La Porte PGP (20 mi, 80%). EHT propylene export assets can load up to 72 MBPD of semi-refrigerated propylene.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.