Neches River Ethane/Propane Export Facility
Project information
As at 31 December 2025
Description
As at 31 December 2025
New export facility on the Neches River; phase one entered service in July 2025 with a loading dock, a 120 MBPD nameplate ethane refrigeration train and 0.9 MMBbls of ethane storage. Phase two, adding a second refrigeration train capable of loading up to 180 MBPD of ethane, 360 MBPD of propane, or a combination, is expected to begin service in the first half of 2026. Volumes sourced from the Mont Belvieu complex.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.