Morgan's Point Ethane Export Terminal
Project information
As at 31 December 2025
Description
As at 31 December 2025
Ethane export terminal with a nameplate loading capacity of ~10,000 barrels per hour of fully refrigerated ethane, sourced from the Mont Belvieu complex. A December 2025 project added 0.9 MMBbls of incremental storage; one 120 MBPD refrigeration train can refrigerate either ethane or ethylene for operational flexibility. Co-located with the 50%-owned ethylene export terminal.
Processing facilities
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.