Front Range Pipeline
Project information
As at 31 December 2025
Type:
Processing Facility
Type:
Processing Facility
Aggregation level:
Asset
Aggregation level:
Asset
Status:
Operating
Status:
Operating
Report standard:
-
Report standard:
-
Ownership %:
33.3
Ownership %:
33.3
Operator:
Yes
Operator:
Yes
Extraction:
Processing Facility
Extraction:
Processing Facility
Country:
United States
Country:
United States
Region:
Colorado to Texas
Region:
Colorado to Texas
Facility kind:
Pipeline Ngl
Facility kind:
Pipeline Ngl
Licensed capacity:
-
Licensed capacity:
-
Capacity unit:
-
Capacity unit:
-
Capacity period:
-
Capacity period:
-
Capacity kind:
-
Capacity kind:
-
Description
As at 31 December 2025
Mixed NGL pipeline from the DJ Basin to Skellytown interconnects; 33.3% equity-method interest. FERC-regulated. Approximately 450 miles of pipeline.
Processing facilities
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.