Enterprise Hydrocarbons Terminal (EHT)
Project information
As at 31 December 2025
Description
As at 31 December 2025
Marine terminal with eight deep-water ship docks and a barge dock accommodating Suezmax tankers (45-ft draft). LPG export loading capacity of ~835 MBPD with capability to load six VLGCs simultaneously; crude oil export assets capable of loading up to 2.9 MMBPD; semi-refrigerated propylene loading up to 72 MBPD; refined products operations with 2.4 MMBbls of storage; crude storage of 23.9 MMBbls across 81 tanks; NGL import capability up to 5,000 bbl/hour. The Ref 4 fourth refrigeration train (+~300 MBPD LPG capacity) is expected in service by end-2026.
Processing facilities
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.