Eagle Ford Crude Oil Pipeline System
Project information
As at 31 December 2025
Description
As at 31 December 2025
50% equity-method interest in a non-operated, effectively looped ~390-mile crude and condensate system from Gardendale to Corpus Christi with capacity over 600 MBPD of light and medium grades; 4.5 MMBbls of gross operational storage; connects to the Corpus Christi marine terminal.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.