Tennessee Ridgeline Expansion
Project information
As at 31 December 2025
Description
As at 31 December 2025
Expansion of the East Tennessee Natural Gas system providing additional natural gas to the Tennessee Valley Authority to support replacement of an existing coal-fired power plant. Scope includes approximately 125 miles of 30-inch pipeline looping, one electric-powered compressor station and an 8 MW behind-the-meter solar array. Expected in service in 2026.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.