Enbridge Ingleside Energy Center (EIEC) — oil project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Largest crude oil export terminal by volume in North America, 100% owned. Construction underway to add a further 2 million barrels of storage in early 2026 under the Phase VII expansion. October 2024 acquisition of two marine docks and adjacent land (Flint Hills) adds export capacity and increases Very Large Crude Carrier windows on primary facility docks; full integration and optimization ongoing.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.