Niosi Marin & Guduma Marin Blocks (Gabon) — project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Two adjacent offshore exploration blocks in Gabon held by VAALCO as a member of the BWE Consortium under production sharing contracts with the Gabonese Government, with a 37.5% non-operating working interest. The Niosi Marin block (2,989 km2) has an initial five-year exploration period to 2029 with a commitment to acquire new 3D seismic and drill one well; the Guduma Marin block (1,929 km2) has an initial three-year period to 2027 with geological and geophysical study commitments. The blocks are adjacent to the Etame PSC. No proved reserves are booked.
Oil & Gas metrics
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.