Block CI-40 โ Baobab Field (Cote d'Ivoire)
Project information
As at 31 December 2025
Description
As at 31 December 2025
Deepwater offshore oil field on Block CI-40 in the Tano/Ivorian Basin offshore Cote d'Ivoire, in which VAALCO holds a 27.4% non-operated working interest (30.4% paying interest), acquired through the April 2024 Svenska Petroleum acquisition. Baobab is produced to a dedicated FPSO with associated gas delivered onshore via subsea pipeline; the field has 24 subsea production wells and five water injectors. The FPSO ceased production in January 2025 for a planned dry-dock refurbishment (completed February 2026) and is expected to return to service in Q4 2026, so all wells were shut in at year end. The PSC term runs to April 2038.
Oil & Gas metrics
Multiple effective dates ยท 1P
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Oil & Gas inventory & footprint
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.