Sue E — uranium project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Uranium deposit on the McClean Lake property supported by the 2005 McClean Technical Report, with the inferred resource estimated at a 0.10% U3O8 cut-off. The operator conducted confirmatory drilling on a portion of the Sue E resource outside the designated pit and in late 2006 submitted a preliminary analysis detailing an inferred resource of approximately 2 million pounds on a 100% basis in that area, against the 7.3 million pounds in the February 2006 technical report. The resource has not been re-estimated using the newer drill information.
Mining metrics
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.