Wink to Webster Pipeline
Project information
As at 31 December 2025
Type:
Processing Facility
Type:
Processing Facility
Aggregation level:
Asset
Aggregation level:
Asset
Status:
Operating
Status:
Operating
Report standard:
-
Report standard:
-
Ownership %:
15.6
Ownership %:
15.6
Operator:
No
Operator:
No
Extraction:
Processing Facility
Extraction:
Processing Facility
Country:
United States
Country:
United States
Region:
Permian Basin (Wink and Midland) to Houston area
Region:
Permian Basin (Wink and Midland) to Houston area
Geological province:
Permian Basin
Geological province:
Permian Basin
Facility kind:
Pipeline Crude
Facility kind:
Pipeline Crude
Licensed capacity:
-
Licensed capacity:
-
Capacity unit:
-
Capacity unit:
-
Capacity period:
-
Capacity period:
-
Capacity kind:
-
Capacity kind:
-
Description
As at 31 December 2025
Approximately 15.6% indirect interest (held through a 50% interest in W2W Holdings) in the Wink to Webster long-haul crude oil pipeline system, with origin points at Wink and Midland in the Permian Basin and delivery points at multiple Houston-area locations.
Processing facilities
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.