Tulsa Refineries
Project information
As at 31 December 2025
Description
As at 31 December 2025
Tulsa West (750-acre site) + Tulsa East (466-acre site) facilities in Tulsa, OK. Combined crude processing rate ~125,000 BPSD. Tulsa West: crude/vacuum distillation with light ends recovery, naphtha hydrodesulfurization, propane de-asphalting, lubes extraction, MEK dewaxing, delayed coker, butane splitter. Tulsa East: crude/vacuum distillation, naphtha hydrodesulfurization, FCC, isomerization, catalytic reforming, alkylation, scanfiner, diesel hydrodesulfurization, sulfur units. Tulsa West also produces specialty lubricants/base oils/waxes.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.