Sabine Pass LNG Terminal
Project information
As at 31 December 2025
Description
As at 31 December 2025
Natural gas liquefaction and export facility at Sabine Pass, one of the largest LNG production facilities in the world (Liquefaction Project), with total production capacity over 30 mtpa of LNG. The terminal also has five LNG storage tanks with aggregate capacity of approximately 17 Bcfe, regasification (vaporizer) capacity of approximately 4 Bcf/d, and three marine berths (two accommodating vessels up to 266,000 cubic meters and one up to 200,000 cubic meters). Liquefaction is operated through subsidiary SPL; regasification and storage through SPLNG, which holds a long-term TUA with TotalEnergies for 1 Bcf/d.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.