Bilboes Project
Project information
As at 31 December 2025
Description
As at 31 December 2025
Large high-grade gold deposit comprising the Isabella North, Isabella South, McCays, and Bubi open pits. Located approximately 75 km north of Bulawayo, Matabeleland North, accessed via public roads. Property comprises 131 claim blocks covering 3,114.7 ha. Archaean lode structurally controlled deposits consisting of silicified stock-works and veins. Acquired in January 2023 for 5.1 million shares and a 1% NSR. October 2025 Feasibility Study outlines a single-phase development producing ~200 koz Au in its first full year with a 10.8-year LOM, initial capex funded by a US$150M convertible note. First production anticipated in late 2028.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.