Penguin Lake (Cluster III) — iron project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 March 2025
Description
As at 31 March 2025
Exploration-stage iron ore property near the closed Lac Jeannine Mine, in a series of claims known as Cluster III. The claims were optioned to Cartier Silver Corporation (formerly Cartier Iron Corporation); Champion Iron Limited holds 45% of the property. The main asset is the Penguin Lake deposit. Cluster III also includes a series of small deposits near Round Lake, north-west of Penguin Lake. Resource estimate based on a February 3, 2014 technical report with effective date May 1, 2013. Estimate is disclosed as historical, non-compliant with NI 43-101 or the JORC Code, and should not be relied upon. Total historical inferred resource is 535 Mt (239 Mt attributable to Champion based on 45% interest) at 33.1% Fe.
Mining metrics
As at 1 May 2013
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 1 May 2013
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.