Rochester — silver & gold mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
100%-owned open-pit heap-leach silver-gold mine in northwestern Nevada (Pershing County), operating since 1986. Significantly expanded in 2024 with the POA 11 project: a three-stage crushing facility, new leach pad, and new Merrill-Crowe processing facility. Includes Nevada Packard and Lincoln Hill satellite deposits. 2025 reserves at $26.00/oz Ag, $2,200/oz Au; variable oxide/sulfide recoveries and NSR cut-offs. Q4 2025 tonnes crushed +12% to 6.4Mt, tonnes placed +23% to 9.3Mt. Q4 silver production +6% and gold +20% QoQ.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.