Sasa
Project information
As at 31 December 2025
Description
As at 31 December 2025
Underground zinc-lead mine comprising the Svinja Reka and Golema Reka deposits. Located in North Macedonia. Mining methods include cut-and-fill and long-hole stoping using paste backfill. Acquired by CAML in 2017. Processing via crushing, milling, and froth flotation to produce separate zinc and lead concentrates. Transitioned to dry-stack tailings and paste backfill in 2025. Life of mine reduced to 2034 following a 2025 review.
Mining metrics
As at 31 December 2025 · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.