Kounrad
Project information
As at 31 December 2025
Description
As at 31 December 2025
In-situ dump-leach and SX-EW copper operation recovering metal from historical waste dumps. Located near Balkhash, Kazakhstan. Property comprises the Eastern and Western Dumps. Operated continuously since 2012. SX-EW plant processes pregnant leach solution to produce copper cathode. Powered partially by an on-site 4.77 MW Solar Power Plant.
Mining metrics
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.