Minosa — gold mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Open-pit heap leach gold mine located in the highlands of western Honduras, approximately 210 km southwest of San Pedro Sula. Property comprises three concessions covering 2,399 ha. Hosted within Tertiary-aged felsic volcanic flows and tuffs associated with the San Andrés Fault. Acquired by Aura in 2009 following Yamana's acquisition of RNC Gold. Processing facilities include two-stage crushing, drum agglomeration, heap leach pads, and an ADR plant. LOM production plan includes 30.7 Mt of material placed through 2029.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.