Borborema
Project information
As at 31 December 2025
Description
As at 31 December 2025
Open-pit gold mine located 26 km east of Currais Novos. Property comprises three mining concessions totaling 2,907 ha within the Seridó Belt. Mesothermal/orogenic gold deposit hosted in a sheared and deformed greenstone belt sequence. Achieved commercial production in September 2025. Processing utilizes a 2.0 Mtpa single-stage SAG mill and CIL circuit. Expansion requires the construction of a 5.3 km bypass of Federal Highway BR 226.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.