Blackwater Gold Mine
Project information
As at 10 September 2021
Description
As at 10 September 2021
100%-owned (via BW Gold) Blackwater open-pit gold-silver project in central British Columbia, Canada. EPC plant construction (~$318M EPC contract) underway with major works commenced 2023 following BC Mines Act Permit award. Approximately 59% complete at December 31, 2023 with ~$389M spent. Fisheries Act Authorization received. Phase 2 expansion advanced to year 3 of operations for increased production capacity. Connection to BC Hydro's Glenannan substation energised. Reserves at $1,400/oz Au and $15/oz Ag, exchange rate 0.75 US$/C$; 93% Au and 55% Ag metallurgical recovery; NSR cut-off C$13.00/t.
Mining metrics
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.