San Bartolome — silver mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 1 December 2023
Description
As at 1 December 2023
Silver processing facility and surface operation flanking the historic Cerro Rico in Potosí, Bolivia. The operation processes alluvial and colluvial unconsolidated sediments (pallacos), high sulfidation deposits (Tollojchi), and intermediate sulfidation deposits (Alta Vista and Paca), alongside purchased ore from third-party cooperatives. Property rights are held under three Administrative Mining Contracts for Adaptation with the AJAM, valid until 2050. Originally commenced commercial production in 2008 and acquired by the current operator in 2018. The plant utilizes crushing, scrubbing, screening, and cyanidation. Fines Disposal Facility (FDF) reprocessing was commissioned in July 2024. Flagship Bolivian silver asset.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 1 December 2023
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.