Arthur Gold Project
Data compiled from public filings β information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Arthur Gold Project (formerly Expanded Silicon) comprises the Silicon and Merlin deposits in southern Nevada near Beatty. Pre-Feasibility Study completed at year-end 2025 reports an initial Probable Mineral Reserve of 4.9Moz of contained gold (88Mt @ 1.75 g/t) and 7.8Moz contained silver (88Mt @ 2.76 g/t) at $1,950/oz. Initial 9-year mine life supports ~500,000oz/yr average annual production at LOM TCC ~$778/oz and LOM AISC ~$954/oz. Project capital ~$3.6bn (real terms). >95% of mineralisation hosted in oxide material amenable to bulk mining methods and conventional processing. Conventional open-pit with electric rope shovels and ultra-class haul trucks. Integrated 7Mtpa CIL plus 5.5Mtpa crushed heap-leach circuit; filtered dry-stack tailings. Merlin deposit hosts additional Indicated Mineral Resource of 1.0Moz Au + 2.0Moz Ag and Inferred Mineral Resource of 5.5Moz Au + 13.7Moz Ag (Dec 31, 2025). PFS expected to be presented to Board June 2026 for approval to transition to feasibility study phase.
Mining metrics
As at 31 December 2025 Β· exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources β detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright Β© 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.