Ewoyaa Lithium Project
Project information
As at 30 July 2024
Description
As at 30 July 2024
Flagship spodumene-rich lithium pegmatite project comprising eight main deposits including Ewoyaa, Okwesikrom, Anokyi, Grasscutter, Abonko, Kaampakrom, Sill and Bypass. Located approximately 100 km southwest of Accra and 110 km from the Takoradi deep-sea port, adjacent to the Takoradi-Accra N1 highway and grid power. Property covers 509 km2 of granted and under-application tenure. Advancing through permitting phases with the Mining Lease currently before the Parliament of Ghana for ratification. June 2023 DFS confirms economic viability. Elevra Lithium holds a 22.5% interest and an offtake agreement for 50% of production.
Mining metrics
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.