Rincon Lithium Project
Project information
As at 12 November 2024
Description
As at 12 November 2024
Lithium brine project located within the Salar del Rincon in Salta Province, Argentina, in the lithium triangle. Property comprises up to 8,606 hectares of mining concessions and mining easement right landholdings. Updated hydrogeological dynamic modelling indicates brine can be pumped for up to 45 years at 12,000tpa LCE or 23 years at 24,000tpa LCE. Detailed engineering works completed on 40MW Medium Voltage Line Project. Flagship asset.
Mining metrics
As at 12 November 2024 · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 12 November 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.