Plata Mining Unit
Project information
As at 31 May 2025
Description
As at 31 May 2025
Restart-stage underground silver-gold-lead-zinc mine within Silver X's Nueva Recuperada district, central Peru. Production targeted to commence in 2027 at 720 tpd in 2028, ramping to full PEA capacity of 1,500 tpd in 2029. Resource of 6.5 Mt @ 7.24 oz/t AgEq (~47.3 Moz AgEq). The PMU covers 3,829 hectares with 17 surface-exposed mineralized veins (0.6-1.0m wide) connected to the Chonta and Huachocolpa-Huancavelica major fault systems. Historical production of ~1.8 Mt @ ~16.03 oz AgEq/t. Higher-grade mineralization identified below 4,460 metres above sea level with mineralization open at depth. ~14 year mine life per Sept 2025 PEA.
Mining metrics
Multiple effective dates · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 May 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.