Kibali
Project information
As at 31 December 2025
Description
As at 31 December 2025
Multiple gold deposits including KCD, Sessenge, Gorumbwa, and ARK along the KZ Trend. Located in northeast DRC, ~1,800 km northeast of Kinshasa, accessed via charter flight from Entebbe or road from Mombasa/Dar es Salaam. Property covers ~1,836 km2 across ten Exploitation Permits. Mineralization hosted primarily within siliciclastic rocks, BIFs, and chert. Underground accessed through twin declines and a vertical shaft system. Hybrid power supply system includes three off-site hydropower stations, diesel generators, a 16 MW solar plant, and BESS.
Mining metrics
As at 31 December 2025 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.