Agbaou Mine
Project information
As at 31 December 2025
Description
As at 31 December 2025
Operating open-pit gold mine located 20 km from the Bonikro Mine. Located 100 km south of Yamoussoukro, accessed via sealed highway with grid power supplied via a 90 kV transmission line from the Hiré substation. Property covers a 334 km2 exploitation permit. Hosted within the Birimian Baoulé-Mossi Domain, associated with the Oumé-Féttékro greenstone belt. Commenced commercial production in January 2014 and acquired by the current operator in March 2021. The conventional CIL process plant has a capacity of 2.65 Mtpa on blended feed. Exploration is focused on extending mineralization beneath and between existing pits to increase mine life.
Mining metrics
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.