Feysville Gold Project
Project information
As at 25 June 2025
Description
As at 25 June 2025
Open-pit gold development project ~south-east of Kalgoorlie, Western Australia, held under 100%-owned granted tenements, incorporating the Think Big, Kamperman and Rogan Josh deposits. The October 2024 JORC 2012 MRE totals 5.0Mt at 1.2g/t Au for 196koz, reported at a 0.39g/t cut-off within pit shells optimised at A$2,500/oz. Feysville contributed a maiden Probable Ore Reserve of 2.3Mt at 1.2g/t Au for 88koz to the June 2025 Mandilla PFS, with ore planned to be trucked to the central Mandilla processing facility. In-fill RC drilling at Kamperman during the year confirmed high-grade gold, and further resource-definition drilling is planned ahead of the Definitive Feasibility Study.
Mining metrics
Multiple effective dates · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.