Description
As at 31 December 2024
Underground copper-gold mine located 60 km southeast of Cloncurry in North Queensland. Property accessed via a single decline with mining undertaken using longhole open stoping and sublevel caving. Ore is treated through a conventional crushing, grinding, and sulphide flotation circuit. Commenced production in 1996 and acquired by the current operator following a recapitalisation in FY23. Eloise processing plant expansion underway to lift throughput from 725 ktpa to 1.1 Mtpa by December 2026. Flagship operating asset.