Eloise Copper Mine
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2024
Description
As at 31 December 2024
Underground copper-gold mine located 60 km southeast of Cloncurry in North Queensland. Property accessed via a single decline with mining undertaken using longhole open stoping and sublevel caving. Ore is treated through a conventional crushing, grinding, and sulphide flotation circuit. Commenced production in 1996 and acquired by the current operator following a recapitalisation in FY23. Eloise processing plant expansion underway to lift throughput from 725 ktpa to 1.1 Mtpa by December 2026. Flagship operating asset.
Mining metrics
Multiple effective dates | inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — reported lines
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 31 December 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.