Eloise Copper Mine
Data compiled from public filings โ information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2024
Description
As at 31 December 2024
Underground copper-gold mine located 60 km southeast of Cloncurry in North Queensland. Property accessed via a single decline with mining undertaken using longhole open stoping and sublevel caving. Ore is treated through a conventional crushing, grinding, and sulphide flotation circuit. Commenced production in 1996 and acquired by the current operator following a recapitalisation in FY23. Eloise processing plant expansion underway to lift throughput from 725 ktpa to 1.1 Mtpa by December 2026. Flagship operating asset.
Mining metrics
Multiple effective dates ยท inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources โ detail
As at 31 December 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright ยฉ 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.