Developer · Junior / Minor · Copper · Canada
Last updated 21 June 2026
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Development · 2 projects
Gaspé Copper Project
Asset · Pre-feasibility
Project information
As at 4 November 2024
Description
As at 4 November 2024
The Corporation's 100%-owned flagship copper development project on the Gaspé Peninsula of Québec, centered on the Copper Mountain porphyry-skarn deposit (with the Porphyry Mountain and Needle Mountain targets) hosting copper, molybdenum and silver mineralization. A current NI 43-101 technical report (effective November 4, 2024, filed January 2, 2025) reports pit-constrained mineral resources at a 0.12% Cu cut-off; resources are not reserves and lack demonstrated economic viability. The Government of Québec is participating through a committee to maximize regional socio-economic benefits. A 2025 drill program of 110,000 metres was designed to convert inferred resources to indicated/measured, test depth and southern (Needle Mountain) expansion, characterize higher-grade skarn zones and validate geological models, returning numerous wide intercepts including 1,117.5 m averaging 0.25% Cu. In December 2024 the Corporation acquired 199 adjacent claims for 5,000,000 shares and a 2% NSR royalty (half redeemable for $2,000,000). MRE pit optimization used US$4.00/lb copper, US$20.00/lb molybdenum, US$24.00/oz silver and a CAD:USD rate of 1.33.
Mining metrics
As at 4 November 2024 · exclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
As at 4 November 2024
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Pine Point Project
Asset · Pre-feasibility · Ownership 52%
Project information
As at 31 May 2024
Description
As at 31 May 2024
Past-producing zinc-lead mining camp near Hay River, Northwest Territories, held through Pine Point Mining Limited (PPML), a joint venture in which Osisko Metals holds approximately 52% equity and a subsidiary of Appian Natural Resources Fund III LP holds the balance; the JV is governed by a February 21, 2023 Investment Agreement (under which Appian may acquire up to 65% of PPML by funding expenditures) and an April 6, 2024 Joint Venture Agreement. PPML owns a 100% interest in the Pine Point Project, which is supported by a NI 43-101 mineral resource estimate update (Pine Point Zinc-Lead Project Mineral Resource Estimate Update, Hay River, Northwest Territories) effective May 31, 2024; the detailed resource tabulation is contained in that technical report. In November 2024 PPML and the Town of Hay River signed a Memorandum of Understanding to pursue long-term sustainable growth through development and operation of the project.
Mining metrics
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Assumptions
- The projects listed here reflect the information captured in this workspace and are not necessarily a complete picture of the company's portfolio. For authoritative figures, refer to the company's official filings.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
How to read this tab
- The tables below list unit codes most often used in the Base Metals sector for this company. MetalPilot stores contained metal or product in the codes below; grade and tonnage use separate fields. In side-by-side comparison views (stock page Portfolio tab, watchlist By sector), heterogeneous source units are converted to each commodity's preferred display unit (for example Moz Au, kt Cu, MMbbl oil) before summing; the same canonical codes appear in project data.
What the Portfolio tab shows
- The Portfolio tab presents a project-level view of the company's reported assets, built from publicly disclosed information (technical reports, annual filings, MD&A, investor presentations, MRMR / R&R statements, NI 43-101 / NI 51-101 / SEC S-K 1300 / SEC S-K 1200 / JORC / SAMREC / PERC / PRMS / COGEH filings, and similar primary sources).
- Figures are grouped by project type (mining, oil & gas, royalty, stream, processing facility, development, portfolio aggregate) and are shown alongside the headline reserve base, headline production, headline grade / quality, cost benchmarks, estimated lifetime, commercial terms (for royalties / streams), operational capacity (for processing) and a single-figure rating where the underlying data supports one.
- Each data table on the Portfolio tab is followed by ONE Assumptions footnote describing the modelling choices for that table; KPI stat-card assumptions appear in the bottom block instead. All legal and section disclaimers are merged into a single disclaimer list at the bottom of the Portfolio tab.
Concepts in your sector — Base metals
- Cu % / Zn % are the grade norm for base metals; kg/t is for very high-grade deposits. Porphyry copper is typically 0.3–1% Cu; SEDEX zinc 5–15% Zn.
- C1 vs C2 vs C3 vs AISC. C1 is direct mining + processing + transport + by-product credits. C2 adds depreciation; C3 adds corporate/indirect costs. Compare like for like.
- TC/RCs (treatment & refining charges) are smelter payments per dry metric tonne of concentrate — a non-trivial part of base-metal economics, not shown on the Portfolio tab.
- Concentrate vs metal. Miners often sell concentrate (~25–30% Cu) and are paid for contained metal minus TC/RCs. Portfolio books contained metal on a 100% basis.
Portfolio tab — table guide
- Portfolio KPIs — company-level headline numbers aggregated from the featured projects (project counts, attributable annual production by commodity, attributable resource base by commodity, last filing date, operator share). USD value lines multiply attributable volumes by the resolved snapshot price.
- Portfolio snapshot — one-screen summary of the portfolio: counts by type and status, country mix, reporting standards used, operator share, primary commodity, attributable annual production summary and attributable resource base summary.
- Mining — one row per mining project, with columns for project name, location, status, primary commodities, production (with rating), reserves & resources (with rating), grade (with rating), costs and estimated lifetime. Multi-commodity projects emit one summary row per commodity.
- Royalty — one row per royalty interest held by the company. Columns cover the underlying project, operator, commodity, commercial terms (rate, type, cap, area-of-interest), attributable production, attributable reserves and estimated lifetime.
- Stream — one row per metal stream held by the company. Each row shows the underlying project, the streamed commodity, the headline stream percentage, the ongoing per-ounce / per-tonne payment, and attributable production / reserves.
- Processing facilities — one row per midstream / processing facility (pipeline, fractionator, LNG train, storage cavern, refinery, smelter, mill, heap-leach pad, CPP, etc.). Columns include nameplate capacity, contracted capacity, feedstock commodities and operational footprint.
- Development — projects in development status or in a pre-production lifecycle phase. The production column is re-labelled 'Targeted production (rating)' to highlight that the figures are plans, not actuals.
- Portfolio Aggregate — a single company-level row used when the company itself publishes a portfolio rollup (e.g. company-wide 2P barrels across all properties).
- Reserves & resources — detail — a leaf-category pivot showing every reserve and resource category disclosed across the projects.
- NPV (grouped) — all NPV rows captured from the filings, grouped by commodity, resource category, development status and pricing case. Each NPV figure is shown with its discount rate, basis (before-tax / after-tax), currency and value scale.
Ownership / Working interest
- Ownership percentage means the company's working-interest share of the asset: its slice of the project before royalties and before government take. It is shown on a 0–100 scale.
- Mines, oil and gas fields, and processing facilities — this is how much of the asset belongs to the company under that working-interest idea. One hundred percent is fully owned; a lower number usually means partners share the rest.
- Royalties and streaming agreements — the percentage is often not the story; what matters economically is usually the royalty or stream rate, shown elsewhere alongside these figures.
- Oil and gas — read this as gross working interest only. Do not treat it as net production or net wells after royalties; when filings distinguish gross from net, that shows up in how the resource numbers themselves are labelled.
- Below 100% — the short summary for each project names other owners and their stakes when the source says who they are.
- NRI vs WI (O&G). Working interest (WI) is the obligation to pay a share of costs; net revenue interest (NRI) is the share of revenue after royalties and overriding-royalty interests. A 100% WI well rarely produces 100% NRI; typical onshore U.S. NRI is 75–87.5% of WI depending on the lease royalty.
- Operator vs non-operator. The operator runs day-to-day operations; non-operating partners pay their WI share of costs but do not run the asset. Some Portfolio rows show operator share where disclosed.
Unit codes, conversion cheat sheets, cost benchmarks (AISC, C1–C3), reporting standards (NI 43-101, JORC, SEC S-K 1300) and resource/reserve category definitions live in the full terminology & units reference.
Each table lists the numeric band for scores 1–5 (production and resource base; grade where applicable for mining commodities) using the same thresholds as project rating stat cards. Only commodities that appear on featured projects for this document are listed.
Silver
Copper
Molybdenum
Copper uses kt Cu bands (Mlb Cu when lb-scale copper resources appear on featured projects). Lithium grade uses hard-rock % Li₂O bands unless brine-style extraction or brine units appear on featured projects.
Assumptions
- Presented values are denominated in currency of the country where the company is headquartered. Values like market capitalization might differ from the values visible in other parts of the page, where the currency is always USD.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.