Casino
Project information
As at 13 June 2022
Description
As at 13 June 2022
Porphyry copper-gold-molybdenum deposit centered on the Patton Porphyry stock. Located 300 km northwest of Whitehorse, Yukon; access via small aircraft, winter road, and Yukon River, with a planned 132 km all-weather gravel road from Carmacks. Property comprises 1,136 quartz claims and 149 placer claims covering ~21,288 ha. Acquired historical claims in 2006 and expanded via staking. 2022 Feasibility Study outlines a 120,000 t/d open-pit mine and concentrator over a 27-year LOM, plus a heap leach facility for oxide ore. Environmental and Socio-economic Effects Statement submitted to YESAB in October 2025.
Mining metrics
As at 13 June 2022 · inclusive
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Reserves & resources — detail
Multiple effective dates
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Royalties & streams
All royalty and stream interests in the database that refer to this asset by name.
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.