Rocky Mountains Assets — oil & natural gas project
Data compiled from public filings — information only, not investment advice. AI‑assisted; see methodology.
Project information
As at 31 December 2025
Description
As at 31 December 2025
Rocky Mountains regional rollup covering Colorado, Utah and Wyoming: the DJ Basin gathering, treating and processing complex, the DJ Basin crude-oil system, the Chipeta processing complex in Utah, the Powder River Basin complex and the Granger, Red Desert and Rendezvous gathering systems in Wyoming, together with the White Cliffs, GNB NGL, MIGC and OTTCO pipelines. The region carries 3,160 MMcf/d of processing or treating capacity and 232 MBbls/d of liquids capacity across 6,905 miles of gathering and processing pipeline plus 1,557 miles of transportation pipeline, making it the larger of the two regions by gas capacity and by pipeline mileage. Supply is drawn from the Wattenberg field in the DJ Basin, the Uinta Basin via Chipeta's third-party interconnects, the Powder River Basin, and the Moxa Arch, Jonah and Pinedale Anticline fields in southwest Wyoming.
Processing facilities
As at 31 December 2025
Premium access required
This content is available on a paid plan.
Upgrade to Premium to unlock this content.
Copyright © 2026, Metal Pilot
We use strictly necessary cookies for authentication and site functionality. Optional analytics (Google Analytics) load only after you accept; we do not use advertising, remarketing, or Google Signals. We honour Global Privacy Control (GPC) and other recognised opt-out signals by keeping analytics off for that browser.